From: route@monster.com
Sent: Friday, April 29, 2016 3:31 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Lee M. Rood
951-852-7601
CAroods4@yahoo.com OBJECTIVE
My objective is to join the right team
in a field that offers growth, job stability and an enjoyable work
environment. Work Experience 09-01-14 to 08-18-15 Verigent /Communication
Innovators
Soda Springs, Idaho I
relocated to Soda Springs, Idaho to work on a yearlong contract at the
Monsanto Plant located there. I took part in all fiber and cable placement.
Utilizing
Panduit products in the closets, cable terminations and cable hangers when
needed.
DeltaV18ga shielded control cable was placed for equipment monitoring
Cat5 Data Cable 400,000’ throughout the facility used for Cameras, WIFI, Network
Wiring and Television. 4-2014
to 08-2014
Mason Technologies Inc.
National Gov. Contractor
Upon successful completion of the
OSHA- 10 Hour Construction Industry Outreach and
Securing a pass that allows me to enter Veterans facilities across the US. I
have been
dispatched to VA facilities with the required tools and safety clothing. These
contract positions have taken me to Tuscaloosa, Alabama where I placed WIFI
routers linked with
Cat6 balanced cabling into the campus buildings in the Veteran’s
Administration Facility. This contract position
took me to: Tuscaloosa, LA
: Prescott, AZ
: Shreveport, LA 09-2013 to 03-2014
Pyramid / AT&T
Palmdale, CA § Upon
completion of two week training on excel and cable identification, I returned
to my home office to edit OSP from my
desktop via Google. After my review of existing plant, recommendations were
developed. 07-2013 to
08-2013
Mason Technologies Inc.
Deer Park, NY § This
contracting
position took me took me to Woburn, Massachusetts to place WIFI routers, and
access points into the campus buildings of the Veterans Administration. We
placed new Cat6 balanced cable throughout individual buildings from the
closets to all designated rooms. Unfortunately, upon completion of the first
campus the funding for the projects ceased.
10 -2012 to 06-2013
Verigent / Mutual
Telecom Services
North Las Vegas, NV § I dispatch
from the main switch location to service telephones, modoms and other
signaling devices across a secure site. My duties included Moves, Adds,
Changes and Deletes in addition to trouble tickets. The van I utilized was
equipped with radio and tools on site. I received my work orders in the field
throughout the day, upon completion of each WO, I notified the Customer
Service Relations. I am familiar with the 3M
Dynatel DSP965 Subscriber Loop Analyzer and Sidekick Test Set. 08-2012 to
10-2012
ROLINC / Staley Technologies, LLC
Central CA § Mark and I
dispatched with tools, transportation and a work schedule to install new
Wi-Fi systems into 13 Costco Stores. We wired for 12 new modems and placed 24
wireless modems at each store. Work was accomplished using 26’ scissors lifts
and Cisco equipment previously shipped to each store. 07-2012 to 07-2012 Lead Staffing / Communication
Wiring Specialists San Diego, CA § I worked in
two Kodak facilities placing Structured Cabling Systems. 02-2012 to 06-2012
Verigent / Mutual Telecom Services
North Las Vegas, NV § See
Duties Above 2011.
To
09-2011
Verigent / Mutual Telecom Services
North Las Vegas, NV § See
Duties Above 10-2010 to
06-2011
Robert Half Technology / Cellergy
Menlo Park, CA § I worked in
the Southern California area with Cellergy Networks installing structured
cabling systems and various other solutions for their clients at the
Salvation Army. 03-2010 to
05-2010
John Griffin Const. Inc.
Corona, CA § I worked on
trenching crews in San Diego training for the upcoming Los Angeles project. 07-2008 to
08-2008
Outsource
Telecom
El Segundo CA § Installed
VOIP wiring in Bank of America Buildings in Southern California and worked
for Hewlet Packard building radio antennas. 6-2007 to 07-2008
Collabera
/ AT&T COMMUNICATIONS
San Jose, CA § I trained as
a Lightspeed Engineer in ARES, Workprint, and F-2
verification to condition existing cable plant. Utilizing various computer
programs to access Abbreviated Cable Reports, Jam
and Formtek historical maps were printed. Using fielded OSP
prints, verify their accuracy, and develop accurate Workprints used to
evaluate the expense of modifications to existing plant necessary for
Lightspeed Service to ATT cliental. 11-2005 to 06-2007
Teksystems
La Jolla, CA § As a Structured
Cabling Systems technician working for the City of San Diego I worked
on the New Florence Joyner Elementary School providing the installation of Cat5,
Cat5e, Cat6, FO, Version 6&11 coaxial cables, Alarms, Security, AV, PIR,
Fire, Smoke, OSP, CCTV and
CATV.
02-2004 to 11-2005
Cable INC.
Fontana, CA
§ Voice/Data,
and FO installations for the San Jacinto School District in new elementary
schools to include FTTN and copper upgrades in existing High Schools
and Middle Schools(ISP & OSP). § Dr’s Hospital
Culver City complete remodel to include Cat6 to all patient rooms, nurse
stations. Crews placed version 6 Coax design from basement Data Room
throughout 7 floors of the hospital. This supports state of the art
articulating arm devices that support flat screens capable of providing CCTV,
Internet and Dr’s reports on patient status to every room. 09-2003 to 02-2004
Teldata
Enterprise Networks
San Diego, CA § I am a
Structured Cabling Systems Technician placing, terminating, and testing
Cat5/CAT5e, Cat6 voice and data cables at Pomerado Medical Center, Palomar
Medical Center, El Centro Hospital and Balboa Naval Hospital. This work took
place during regular hospital hours in and around doctors and patients.
06-2000 to
09-2003
Sim J. Harris Communications
San
Diego, CA § Estimated
school projects, ordered and received materials, maintained tools, and
managed E-Rate
construction crews working in the LAUSD (FO) to all classrooms. § I managed
voice/data and fiber placement at Camp Pendleton. Planned and placed
wire mold and fiber optic into sixty-one buildings on the
base. § I
supported many Broadband construction projects in various southern CA venues,
Project manager for voice/data and FO installation for Mitchell
International. § I engineered
routing of existing cabling for Rexel Project Phase I and Phase II CATV
engineering of the San Diego Elementary Schools. 01-1998 to 06-2000
Cable
Tech Services
Ontario, CA § Bid and built
projects for outside plant and premise wiring placement. I put together
complete project contracts to include labor, materials and equipment costs to
include projected return for services. § Tracked
production of crews on GTE’s OSP broadband project in Thousand Oaks, CA. We
trenched and directionally bored their system into local residential
developments. § I made new
customer contacts for future work. 09-1985 to 01-1998
Ron Morell Construction
Fontana, CA § I secured a contract
for CATV construction based on a /foot price and managed crews for OSP aerial
and UG CATV installation. Contract value was excess of $1 million. § I was the on
-site project manager for communications installation CSUSB IW and cable
placement in the tunnel distribution system on campus. I also placed
horizontal and vertical wiring at the new Von’s regional office in El Monte. § On-
site project manager for conduit, manhole, and OSP cable installation at
Paramount Studios. We built the protection racking and wire wrapped our OSP
in the new switch room ($2 million project). § On site
manager for technicians at Warner Brothers Studio, coordinated OSP (Cable
placement) and IW projects (MAC Orders) EDUCATION 1975
to1979
Boise State University
Boise, ID · General
education /engineering · Secondary
education /math with physical education MISCELLANEOUS Ø Injury Free Environment-Level 1 Trained Ø Hilti Qualified Operator-Powder Actuated Tools
#3276893 Ø Hilti expertise in every case-Firestop Systems FS
0146085 Ø Hazwoper Certified 12-15-2009 40 Hour Training :
Hazardous Waste Operations Ø Hazwoper Certified 05-09-2010: 8 Hour Annual Refresher:
Hazardous Waste Operations Ø Hazardous Waste Supervisor 05-13-2010 Ø Hazardous Waste Supervisor for Incident Command System
05-13-2010 Ø Hold a BICSI Telecommunications Distribution
Fundamental Program Certificate. Ø As an RME to Ron Morell Construction, I held a C-7
California Contractor License for 12 years. Ø As a Regional Superintendent for RAC/Winegar, I was
responsible for over 102 aerial laborers and equipment. I managed CATV aerial
construction in the Southern California area for 3 years. Ø Experienced scissor lift operator up to 30’ Ø Married to Susan with two children Ashlee and Jacob |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|